We are now complete with phase one of the WR Record Center in Irving Texas. This is the first of a two-phased project for Veteran record storage. These projects have stringent specifications which include emergency generator, fire pumps, and secondary source fire lines. This project included $250,000 of in-rack sprinkler system alone. All of the sites require particular design criteria such as a secondary fire line which isn’t typically available. These projects require our team member Jensen Hughes to provide fire design consulting to ensure that the stringent specifications are met. While these are not NARA Government sites, they house Government records and require the same specifications as NARA Facility in Washington DC. This is the second facility that we have constructed that meet the National Archives & Records Administration specifications for record storage. Phase two begins soon.